Smithfield Gateway Development: Phase 1 Stormwater

Smithfield Gateway is a massive development in Marshalls Creek, PA. It will eventually include medical offices, retail shopping and townhouses. The first phase of the project included installing a 72 inch stormwater pipe. This pipe run is 300 yards long and is sometimes more than 40 feet deep and it required us to use a special drill to bore under the highway.